6th Annual Advanced Submarine Power Cable and Interconnection Forum will be between 13 Jun and 15 Jun 2017.
The calls you to Berlin, for 6th Annual Advanced Submarine Power Cable and Interconnection Forum. It will take place at Angleterre Hotel Berlin.
6th Annual Advanced Submarine Power Cable and Interconnection Forum (Submarine Power Cable & Interconnection 2017) is going to be the platform where authorities from Engineering, Electrical Engineering and Energy will assemble to examine perceptions and theories to advance expertise for Electricity, Electrical Engineering, Interconnection, Submarine and Submarine Cable subjects.
Submarine Power Cable & Interconnection 2017 is organized annually.
The professional congress organizer of the Submarine Power Cable & Interconnection 2017, 6th Annual Advanced Submarine Power Cable and Interconnection Forum is BIS GROUP s.r.o..
When you are in Berlin for Submarine Power Cable & Interconnection 2017, explore these three must visit places and fall in love with the charm of this city:
Visitor Profile
Vice Presidents, Directors, Heads, Managers Engineers of:
- (Submarine) Cable Projects
- Interconnection Projects
- Network Planning
- Submarine Network Planning
- Transmission
- HVDC – Engineering/Maintenance
- Assets Management
- Offshore Grid Integration and connection
- Operations
- Electrical Engineering
- Cable Installation, routing and laying
Venue
Angleterre Hotel Berlin
Address : Charlottenstraße 97B, 10969 Berlin, Germany
Travel Guide
Events
- Submarine Power Cable & Interconnection 2016
14 - 16 June 2016
Leave Your Comment